I had to change the layout. Of course a toilet is to be installed next to the shower. The wrong layout and improper plumbing meant that the shower would be to close to the toilet. I changed the plans and decided to install a tub unit.
The second day I finished framing in the ceiling and had the electrician come and do his rough installation. This was on New Years Eve day. The electrician didn't want to come until the following Monday. When I asked him if that's how long it would take him to recover from New Years eve partying he showed up about an hour later.
Started insullating.
Framing in the ceiling meant incorporating hip rafters into the scheme of things and also the support post for the rafters.
After the electrician finished his rough, I hung the drywall and had it taped on New Years Day.
Carrying 30 some odd boards of drywall up two flights of stairs, around the landings and rails without doing any damage was an amazing feat. One of the reasons I framed everything in metal to be honest was to save time and muscle getting all the material up to where I needed it. The only area not drywalled at this point is where the tub has to be installed.
The rough plumbing. No copper. I'm not use to this at all.
While waiting for the plumber I had plenty of time to spackle.
The only light I had for 2 weeks.
I installed concrete board for the bathroom floors. I always glue down my Dura rock besides screwing it.
I ended up getting the tub kit myself to pressure the plumber to come and install it. I finished the drywall around the tub area and taped and spackled it right away with a quick drying spackle.
I also installed another layer of plywood in the hallway and the walk in closet. I picvked the doors up from the Home Depot. They came pre trimmed. I have never ever bought a door that was trimmed inside and out. I attempted to remove the trim from one side with disatourous results. Thr trim was stapled on. I did learn that the door frames actually came apart behind the door stop. I felt like such an idiot.I rather liked the system. Late at night when I am trying to reach a goal I get to impatient and need to slow down and do a bit more investigating. I actually liked how these door frames differed from what I am used to and will use this idea here at home. I can't wait to see how the Home Depot here reacts to my demand of wanting these doors here.
Due to the time I went with a premixed tile adhesive. I usually use thinset that I mix myself but I wanted to get the tile in that day. The day the tub went in, by 10:00 that night I had the bathrooms tiled. I ran short of adhesive by about a gallon and had to send out for some more. This picture got me what I needed.
See.
I grouted the following morning and found that I was very dissapointed in the tile adhesive.Thinset starts setting in a few hours. The adhesive I used still had some movement in the tile.
Tiles installed and grouted and the doors are installed.
OOOOps, 1 out of order.
There were a few vents coming from a bathroom below so I through a shoe rack shelf over them. The carpet layer can run carpeting over it.
I finished the trim and caulking and spackle touch ups on Thursday. Finishing up the day at about 4:30 felt so wierd but I had the time that night to get all my tools and equipment loaded up and on the road home by 7:30am Friday.
So, that is what the last 2 weeks of my life consisted of. Now go smack the boredom from your head.
Good job, Mac...now...I need a bathroom...
ReplyDeleteDon't you start Suzi, lol. I got tied up on 95 in Virginia for 3 hours the day I drove down there. I kept blaming you for it.
ReplyDeleteLol Mac, looks like you did a fantastic job, I hope they appreciate all of the hard work you did....I don't need a new bathroom but could use a kitchen remodel! lol
ReplyDelete
ReplyDeleteI like to do what I can for my friends...
Looks awesome Mac. I bet the family is thrilled too.
ReplyDeleteAll these homes in the subdivision I live in are all metal framed. The subdivision is 36 years old. You don't have to worry about wood drying out and twisting down the road.
Wow Mac an awesome two weeks! Looks as though you did a great job with it.
ReplyDeleteHow much are you an hour?? Wow Mac what a wonderful son in law you are!!You will need a rest now LOL What a fabulous job you have done .
ReplyDeleteCan't wait to see your project finished Mac...super nice job and your "outlaws" are lucky to have you in the family:):):)
ReplyDeleteHow much would you charge for a 4 season room????? LOL Looks great Mac, you're a good man !!!!
ReplyDeleteWow want and come do mine next...lolol
ReplyDeleteOMG..just the man I want..we are starting to make my bathroom next week. Looks wonderful..great job Mac.
ReplyDeletegeeeeez mac, anda ll i wanted was to have my bathroom FLOOR replaced, all 6x6 of it. the tile floor and wall i could do myself. now whats the rate for TRAVEL and labor again???? BEAUTIFUL job , really.
ReplyDeletewow Mac great job,if i didnt have a jackofall husband i would be calling you for sure lol ttyl
ReplyDeleteWe need to put one of them in down here in the 70's basement...wanna come help? Nice job Mac and welcome back!
ReplyDeleteWell Dang Mac, you could have come visit us while you were in NC! We would love to have met ya up in the mountains here. Great job on the Bathroom (I think our whole house would fit inside it lol)
ReplyDeleteMy hubby and I have changed all but one room in our house. We are putting off my kitchen till we are finished with the rest. That room will be a big expencive project. lolI Daily thank God that my feller is good at building. But he HATES plumbing. I bet your other half feels the same
ReplyDeleteFor some reason some people I know, no mention of any names here, don't really have a clue regarding how much it would cost to have someone come and do a repair or build or renovated, auto repair or appliance repair and the like. It just gets done. Maybe not right away but eventually, lol.
ReplyDeleteive watched my husband do all sorts of jobs and just from what ive seen,the bathrooms and kitchens are the hardest because of all the plumbing,thank God for people that can do these kind of jobs lol,otherwise,we would all still be in the outhouse eeeekkk,and yuckkkk and worry about spiders haha ttyl deb ps great job Mac,and have a great day D ttyl
ReplyDelete